Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Pre-Project Data Gathering:

Intro documentation from stakeholders-

  • Logo, mission statement, basic health center/patient data, roles/titles/contact info (Sarah)

Technology capacity: EHR and HIT system info (Raymonde)


Phase 1: Setting the Stage-- HCD document (Sarah)

  1. Stakeholder identification
  • Contact List
  1. Environmental Scan
  2. Needs/Gap analysis
  3. Goals, Scope, Outcomes


Continuous Improvement (throughout):

  1. Decision Log
  2. Lessons Learned Document
  3. Timeline/Milestones -- (Gantt if available)
  4. Swim Lanes (for partners-- should incorporate timeline/milestones)
  5. Project Principles and Rules of the Road--Norms/Guidelines


Phase 2: Understanding the Context (Ray/Julia)

  1. Personas -- examples, guidance
  2. Use Cases -- examples, guidance
  3. Metrics-- Definitions: quality measures, operational measures, patient and care team experience, resources, clinical outcomes
  4. Data Categories
  5. Workflow--slides, journal article, examples -- with description of relationship to dataflow (Raymonde)


Phase 3: Understanding the Data (Pedro)

  1. Dataflow
  2. Data Validation Plan
  • Feasibility/workflow/extraction evaluation
  • Data QA
  1. Data Dictionary
  2. Baseline Measures
  • Baseline Data


Phase 4: Designing a Solution

  1. Intervention Brainstorming
  2. Technical Plan
  • Standards
  • Terminology content
  • Data model/element specifications
  • API or data extraction
  • Conformance Testing
  • Site Architecture
  • Interoperability Planning
  • Site Integration
  1. Implementation Plan
  • Integration Considerations
  • Timeline
  • Implementation Scope
  • User Requirements and User Data
  • Training
  • Implementation Package
  • Evaluation Package-- metrics
  • Testing Plan
  • Feedback to Users
  • Feedback from Users
  • Change Plans
  • Technical Assistance Plan
  1. Dashboards and Feedback
  2. Project Outcomes and Modifications
  3. Training Package
  • Local training materials


Phase 5: Implement and Evaluate

  1. Build solutions
  2. Test
  3. Improve and finalize initial stage
  4. Implement pilot
  5. Evaluate
  6. Plan for scale
  7. Implementation Guide


Phase 6: Scale and Maintain

  1. Rollout plan
  2. Evaluation plan
  3. Feedback from users
  4. Maintenance


Curriculum Materials:

  1. HCD 2 pager--> convert to 1 pager
  2. HCD graphic
  3. Gantt chart
  4. Powerpoint
  5. Data Dictionary Template
  6. Data Reference Document
  7. HCD User Guide
  8. Branding Materials


Technical Plan:

Standardized content across implementation sites-- describes HIT standards, terminology requirements, transport and data standards, validation and testing requirements, data dictionary, measure specifications, generic flows

Implementation Plan:

Individual site/system level specifications for the technical plan and local requirements

  • No labels